Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
botlab:openmeeting_20160712 [2016/07/19 21:51]
dwyatt [Topics discussed]
botlab:openmeeting_20160712 [2016/07/22 07:42] (current)
dwyatt Revised to clarify what type of lathe we could buy for cost of installing 3-phase
Line 49: Line 49:
     * 3-phase supply for Hardinge Lathe:     * 3-phase supply for Hardinge Lathe:
       * TSc: may be able to use 3 electronic inverters with soft-start to run it off 240V 13A supply       * TSc: may be able to use 3 electronic inverters with soft-start to run it off 240V 13A supply
-      * John W commented in proposal that it would be cheaper ​to get a new lathe than install ​a supply for it! This would be a machine comparable to Matt's old lathe, i.e. smaller than Hardinge but probably big enough.+      * John W commented in proposal that it would be possible ​to get a second-hand ​lathe for the same cost as installing ​a supply for it! (This would be a machine comparable to Matt's old lathe, i.e. smaller than Hardinge but probably big enough.)
       * RD: would like to be sure of lease terms before significant investment in building fabric.       * RD: would like to be sure of lease terms before significant investment in building fabric.
       * NM: Building owner seems comfortable here and is unlikely to sell, but //we// don't know if we will stay.       * NM: Building owner seems comfortable here and is unlikely to sell, but //we// don't know if we will stay.
  • botlab/openmeeting_20160712
  • Last modified: 4 years ago
  • by dwyatt